Chapter 3: Installation

3-20

EMM-E6 Installation Guide

3.6

BACKPLANE TEST

Once the EMM-E6 has been installed in the network environment, you
may wish to test the operation of the Ethernet bridging functionality and
the EMM-E6’s connection to the chassis backplane. Again, you can use
two workstations set up as file server and client. See Figure 3-11.

1. After the EMM-E6 is installed in the MMAC, connect the client

workstation to the EMM-E6 EPIM 1 port.

2. Connect the server workstation to another Ethernet MIM that is

accessible from an Ethernet channel in the MMAC-FNB hub.

3. Send packets between the two workstations to verify the proper

operation of the EMM-E6. A “ping” test will send packets from one
station to another.

If a failure occurs, contact Cabletron Systems Technical Support.