BoonDocker SKI-DOO: 2013-14 XM E-TEC 800 User Manual

Page 4

Advertising
background image

Revised 12/28/2012

Page 4 of 10

www.boondockers.com……………….....

……….………………....877-522-7805

13.Hook up BoonDocker box throttle position
harness to throttle body & to stock harness. Note
zip tie off all wires so they don’t chaff threw &
short to ground.

14.Route wiring through the side below the han-
dle bars as seen in picture down the stock har-
ness to the power adapter harness & throttle po-
sition hook ups (as seen in step13).

15.Install the throttle body tab clamp on the
throttle body with the tightening screw at the top
of the assembly. Then install the silicone hose &
twist clamp in to position & tighten clamp.

16.Install silicone on the left side of the Y
tighten the hose clamp. Leave all the other
clamps loose for proper alignment & fitting.

17.Install the rest of the air box & Y. NOTE
make sure you index the hose clamps so you can
access them for tightening after you install the
tank. Still leaving the hose clamps slightly loose.

18.Install the injectors in the injector rails. Use
assembly lube so you don’t tear an o-ring. Route
the fuel line as seen in picture. Install the injec-
tor & rail assemblies. Don’t over tighten bolts.

Advertising