BoonDocker SKI-DOO: 2013-14 XM E-TEC 800 User Manual

Page 6

Advertising
background image

Revised 12/28/2012

Page 6 of 10

www.boondockers.com……………….....

……….………………....877-522-7805

25.Install the 3” charge tube. Do not tighten the
hose clamps. Try to slide the charge tube closer
to the Y end for proper fit & for clearance. Hook
up the air temp sensor to the control box. Zip tie.

26.Turn the Y on the PTO side up ward until the
clutch cover fits properly. Be sure to test fit the
head light assembly for clearing the charge tube
setting on the intercooler mount.

27.Install stock temp sensor & zip tie to wiring
as seen in picture. Hook up the boost reference
line to the push to connect on the intercooler.
Route so it does not chaff.

28.Install heat tape on the Chain case, hoses, the
stock EGT cable, oil tank & on the ECM
Bracket.

29.Drill the hole for the spring tab with a 3/16”
drill bit. NOTE the hole is already in the bulk
head you only drill the plastic in the bell pan on
the right side.

30.Install the stock can rubber bumpers on the
turbo bracket using a flat blade screw driver.

Advertising