Routing the air brake cable – Dynojet 250iP: Air Brake and EEC Kit User Manual

Page 18

Advertising
background image

Air Brake and EEC Kit Installation Guide for 200i/250i and 200iP/250iP Motorcycle Dynamometers

A I R B R A K E A N D E E C K I T
Air Brake

14

R

OUTING

THE

A

IR

B

RAKE

C

ABLE

Before proceeding with the rest of the air brake installation it is necessary to connect
the shop air and check the brake pad clearance.
1

Open the front panel of the control panel interface (CPI) to access the breakers
and Breakout board.

2

Route the air brake cable from the air brake solenoid to the CPI.
Note: The CPI end of the air brake cable splits in two.

3

Connect the cable with the two black wires to the Breakout board wiring block
labeled Brake.

4

Attach the 4-pin connector to port P7 on the CPI board.

Figure 15: Routing the Air Brake Cable

P7 on the

CPI board

brake wiring block

on breakout board

Advertising
This manual is related to the following products: