Load cell installation, Parts list, Installing the load cell – Dynojet 224: Eddy Current Brake User Manual

Page 32: Parts list -2 installing the load cell -2

Advertising
background image

Model 224 Above Ground Eddy Current Brake Installation and User Guide

C H A P T E R 2
Load Cell Installation

2-2

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

LOAD CELL INSTALLATION

This section describes how to install the load cell.

P

ARTS

L

IST

The following table lists all of the parts included in the Torque Module Installation kit
(P/N 73920007). Check your kit against the parts listed to make sure you have
received all of the parts. If any part is missing, contact Dynojet Technical Support.

I

NSTALLING

THE

L

OAD

C

ELL

1

Verify the main dyno power is disconnected.

2

Remove the two bolts and nuts securing the existing bar on the eddy current
brake and remove the bar. Set the bolts and nuts aside.

3

Verify the eyelets on the load cell are spaced the same as the bar removed earlier.
Adjust the load cell spacing by loosening the lock nut and turning the eyelet.

Figure 2-1: Verify Load Cell Spacing

part number

description

quantity

35430899

Weight, 25 lb

4

61319001

Calibration Arm Assembly

1

66114002

or

66104001

Torque Module Sub-Assembly

or

Torque Module High Resolution Sub-Assembly

1

76950505

Torque Cell Assembly, 224

1

76950606

Cable, Input, 224 Torque Rev Sw

1

76950607

Cable, Output, 224 Torque Rev Sw

1

distance must be

the same

eyelet

bar