The ControlNet Interface hardware consists of a
dual-board option card. ControlNet-specific functions
are provided by a ControlNet module, which is
factory-installed onto a bus adapter card. The bus
adapter card plugs into an open option card slot on the

520

,

820i

, or

920i

CPU board (or expansion board)

and provides power and access from the indicator bus
to the ControlNet module.

This section describes the procedures used to install
the ControlNet Interface into the

520

,

820i

, and

920i

indicators, connect communications cables, and set
the ControlNet address DIP switches on the module.

2.1

Installing the ControlNet Interface

Use the following procedure to install the ControlNet
Interface into

520

,

820i

, and

920i

indicators.

2.1.1

Installing ControlNet Option in the 820i or 920i

Use the following procedure to install the ControlNet
Interface in the

720i

,

820i

or

920i

indicator:

1. Disconnect indicator from power source.

Disconnect power before removing indicator
backplate.

The

720i

,

820i

and

920i

have no on/off

switch. Before opening the unit, ensure the
power cord is disconnected from the power
outlet.

2. Open indicator enclosure. For indicator

models with backplates, place indicator
face-down on an antistatic work mat. Remove
s c r e w s t h a t h o l d t h e b a c k p l a t e t o t h e
enclosure body.

Use a wrist strap to ground yourself and
protect components from electrostatic
discharge (ESD) when working inside the
indicator enclosure.

3. Carefully align the large connector (J1) on the

bus adapter card with connector J12 on the

720i

, J6 on the

820i

, or J5 on the

920i

CPU

board (see Figure 2-1). Press

down

to seat the

bus adapter card in the CPU board connector.

4. Use the screws and lockwashers provided in

the option kit to secure the other end of the
option card to the threaded standoffs on the
CPU board.

5. Wire the card to the network as described in

Section 2.2 on page 3.

6. Set DIP switch as described in Section 2.3 on

page 3.

7. Use cable ties to secure loose cables inside the

enclosure.

Figure 2-1. ControlNet Card (Card Edge Highlighted)

Installed in

920i, Slot 1 (Connector J5).

8. For indicator models that include a backplate,

position the backplate over the enclosure and
reinstall the backplate screws. For the

820i

or

920i

universal models, use the torque pattern

shown in Figure 2-2 to prevent distorting the
backplate gasket. Torque screws to 15 in-lb
(1.7 N-m).

Figure 2-2.

820i/920i Enclosure Backplate

9. Ensure no excess cable is left inside the

enclosure and tighten cord grips.

10. Reconnect power to the indicator. The

i n d i c a t o r a u t o m a t i c a l l y r e c o g n i z e s a l l
installed option cards when the unit is
p o w e r e d o n . N o h a r d w a r e - s p e c i f i c
configuration is required to identify the
newly-installed ControlNet Interface to the
system.

W arning