Rice Lake Lift Truck/Pallet Jack Scales - CLS-Series User Manual

Page 19

Advertising
background image

Junction Box Replacement

15

Figure 3-5. Bottom Board Wiring

Once wiring is complete, place the upper board back and secure screws holding the upper board.

Upper/Top Board Information

The second board, or the upper board is pictured in Figure 3-6.

Figure 3-6. Inside of Junction Box - Top Board

The wiring from the bottom board is then brought up to be wired into the top board as shown in Figure 3-6,
connecting into J3 and J6 connectors.

Exits out
t o r i g h t
cell #2

Exits out to
left cell #1

J4 - W iring
for the right
load cell #2
a s v i e w e d
f r o m t h e
driver’s seat

J5 - W iring for
the left load cell
# 1 a s v i e w e d
from the driver’s
seat

Advertising
This manual is related to the following products: