0 junction box and grounding, 1 load cells to junction box, Junction box and grounding – Rice Lake SURVIVOR PL Rail Scale User Manual

Page 12: Survivor, Detail a detail b, Installation manual

Advertising
background image

8

Survivor

®

PL

Installation Manual

3.0

Junction Box and Grounding

Cable installation instructions for the weigh module(s) are included in the following paragraphs.

Load Cell
Cable to
Connector

SI - White

SI - Red

EX - Green

EX - Black

SHD - Shield

+

-

+

-

+SI

-SI

+EX

-EX

SHD

+SI

-SI

+EX

-EX

SHD

+SI

-SI

+EX

-EX

SHD

+SI

-SI

+EX

-EX

SHD

J3

J4

J7

J8

J6

J5

J2

J1

+SI

-SI

+EX

-EX

SHD

+SI

-SI

+EX

-EX

SHD

+SI

-SI

+EX

-EX

SHD

+SI

-SI

+EX

-EX

SHD

Load Cell #1

Load Cell #3

Load Cell #8

Load Cell #6

Load Cell #2

Load Cell #4

Load Cell #7

Load Cell #5

+SI
-SI

+EX

-EX

SHD

-SEN

+SEN

SHD - Shield

+SI
-SI

+EX

-EX

SHD

-SEN

+SEN

Indicator/J10

Expansion/J9

Cable to Indicator

SI - White

+

SI - Red

-

EX - Green

+

EX - Black

-

SEN - Yellow

-

SEN - Blue

+

Load Cell
Cable to
Connector

SI - White

SI - Red

EX - Green

EX - Black

SHD - Shield

+

-

+

-

+SI

-SI

+EX

-EX

SHD

+SI

-SI

+EX

-EX

SHD

J3

J4

J2

J1

+SI

-SI

+EX

-EX

SHD

+SI

-SI

+EX

-EX

SHD

Load Cell #1

Load Cell #3

Load Cell #8

Load Cell #6

+SI
-SI

+EX

-EX

SHD

-SEN

+SEN

SHD - Shield

+SI
-SI

+EX

-EX

SHD

-SEN

+SEN

Indicator/J10

Expansion/J9

Cable to Indicator

SI - White

+

SI - Red

-

EX - Green

+

EX - Black

-

SEN - Yellow

-

SEN - Blue

+

Detail A

Detail B

Pocket 1
Conduit

Pocket 1 and 4
Conduit run to J-Box

Pocket 2 and 3
Conduit run to J-Box

Module A

Module B

Pocket 2
Conduit

Pocket 3
Conduit

Pocket 3 and 4
Conduit run to J-Box

Module C

Conc.

Pier

3

4

2

1

6

5

4

3

2

1

Pockets 1, 2, 5, 6
Conduit run to J-Box

Pocket 1 Conduit

Pocket 1and 6 Conduit

Pocket 2
Conduit

Detail A

Detail B

Figure 3-1. J-Box Wiring and Conduit

3.1

Load Cells to Junction Box

Each load cell is equipped with 30' of load cell cable, sufficient to reach a centrally-located junction box on

standard scales. A conduit adapter and a 14" section of 3/4" flexible conduit is supplied for both ends of each load

cell cable located at the load cell and at the junction box. Main conduit runs between these 14" flexible end sections

are 3/4" galvanized metal conduit already installed on the deck as shown above.

Note

Flexible conduit can not come in contact with the ground. Plastic tie wraps are included in the hardware
shipping box and should be used to tie up the flexible conduit.

Advertising
This manual is related to the following products: