Figure 4-1. load cell assembly, Figure 4-2. bottom view of scale – Rice Lake Summit™ 3000 Low-Profile Package User Manual

Page 15

Advertising
background image

Service Information

11

Lift the scale with a chain and remove foot, then remove the defective load cell. Disconnect load cell cable from

the junction box and cut cable ties. When the cable is freed, pull cable out of the scale frame channels.

Figure 4-1. Load Cell Assembly

Follow the directions given below to install new load cells.
Lay out the four load cells near the corners where they are to be installed. Thread the cable from each load cell

through the conduit tubing in the frame and into the junction box according to the wiring diagram in Figure 4-2.
Note that in Figure 4-2 both
the scale and the junction box are viewed from the bottom. To verify correct load

cell/junction box terminal matching, see the numbers on the terminals inside the junction box and the corner

numbering diagram in Figure 4-4 on page 12.

Figure 4-2. Bottom View of Scale

Check that the threaded holes for the load cell screws are free of debris. Use compressed air to blow out holes if

necessary. Position load cells with alignment arrows pointed up toward the deck and loosely install the hex head

cap screws provided, as shown in Figure 4-1. If the base is used with a pit frame or access ramp, position the load

cell to maintain the dimension shown in Figure 4-3. With the torque wrench, tighten all bolts to 75 ft-lbs.

30112

5K models

2500 lb (1134.0 kg)

30270

10K models

4000 lb (1814.4 kg)

Rice Lake PN

Summit Model #

Load Rating

Table 4-2. Load Cell Replacement Numbers

CELL 1

CELL 4

CELL 2

CELL 3

Advertising
This manual is related to the following products: