Thermal management, 1 operating temperature, 10 thermal – Compaq 21264 User Manual

Page 251: Management, Operating temperature, Operating temperature at heat sink center (tc), Chapter 10, thermal management, 1 operating temperature

Advertising
background image

Alpha 21264/EV67 Hardware Reference Manual

Thermal Management

10–1

10

Thermal Management

This chapter describes the 21264/EV67 thermal management and thermal design
considerations, and is organized as follows:

Operating temperature

Heat sink specifications

Thermal design considerations

10.1 Operating Temperature

The 21264/EV67 is specified to operate when the temperature at the center of the heat
sink (T

c)

is as shown in Table 10–1. Temperature T

c

should be measured at the center of

the heat sink, between the two package studs. The GRAFOIL pad is the interface mate-
rial between the package and the heat sink.

Note:

Compaq recommends using the heat sink because it greatly improves the
ambient temperature requirement.

Table 10–1 Operating Temperature at Heat Sink Center

(T

c

)

T

c

Frequency

80.2

°

C

600 MHz

78.1

°

C

667 MHz

76.9

°

C

700 MHz

76.0

°

C

733 MHz

75.4

°

C

750 MHz

72.7

°

C

833 MHz

Advertising