I n s t a l l a t i o n l

3 - 7

3

Installa

tion

D r a i n C o n n e c t i o n

To drain the chiller for storage or transport:

1

Rotate the chiller’s drain valve counterclockwise. If using chemicals or
additives with your process coolant, observe local disposal laws and regulations.

2

Close the chiller’s drain valve by turning it clockwise once final
evacuation of all process coolant is complete.

IMPORTANT: Drainage procedures must be done prior to shipment or outdoor storage of

the unit. If not, freezing damage can occur.

From Process inlet

To Process outlet

Fill/drain port

Water level gauge

IMPORTANT: Ensure long-term storage environments are above freezing temperatures. If

not, allow the chiller to thaw for several hours before returning it to operation or fill the

chiller’s internal piping with a high mixture of glycol to water during storage.