Installation, Receiving inspection, Safety checklist – B&C Technologies SP Series Commercial User Manual

Page 17: Chapter 4 installation, 1 receiving inspection, 2 safety checklist

Advertising
background image

Chapter 4

Installation

4.1

Receiving Inspection

Upon receipt of the equipment, visually inspect for shipping damage and note any damage with
the carrier before signing the shipping receipt, or advise the carrier of the damage as soon as it is
noted.

If damage is discovered, a written claim must be filed with the carrier as soon as possible.

Note: Warranty is VOID unless the equipment is installed according to instructions. The installa-
tion must comply with the minimum requirements listed in this manual. All national, state and
local codes must be followed including but not limited to gas, electrical, plumbing and HVAC.
Due to various requirements, statutory codes should be well understood before installation com-
mences.

Important: The machine should be transported and handled in an upright position.

4.2

Safety Checklist

Before Initial start up of a B&C free-standing washer extractor perform the following safety check:

1. Make sure all electrical and plumbing connections have been made in accordance with ap-

plicable codes and regulations.

2. Make sure the machine is grounded electrically.

3. Make sure the machine has flexible water fill and drain connections of the correct size, length

and type, with no kinks, and that they are securely attached and/or clamped.

4. Make sure the transport brackets have been removed.

Before machine is placed in operation, the door safety interlock must be checked for proper oper-
ation as follows:

13

Advertising