Hit Products RainPro Expandable User Manual

Page 11

Advertising
background image

3. The controller has 4 active day schedule options:

specific days of the week, interval watering (every
2

nd

, 3

rd

, 4

th

day), ODD or EVEN days of the month.

Only one of these schedule options is available
simultaneously for each independent program.
Each independent program can utilize
different/same schedule option.

UTILIZING THE “SPECIFIC DAYS OF THE WEEK” TO

IRRIGATE

1. Choose program A, B or C. To change program

from existing program, push the PRG button.

2. Using the + and – buttons will make a day either

active or inactive. “+” indicates an active day or
non-circled. Press the “-” button to change to a
circled day, which indicates an inactive day. The
days of the week will automatically advance.

3. Repeat step 2 for each day of the week. The →

button may be used to advance to a particular day
of the week.

4. After programming days of the week as desired,

rotate dial to “RUN” to enter this new data into
controller.

UTILIZING THE “INTERVAL DAY” SCHEDULE

Interval Day allows you to choose to irrigate at an interval
ranging from every day (1), every second day (2), up to
every 31

st

day (31). “Days left” indicates the number of days

remaining until the next scheduled irrigation cycle will occur
for that specific program. As an example, if 2 is the “interval”
and 1 is the “Days Left,” irrigation will occur tomorrow.

11

Advertising