Hit Products RainPro Expandable User Manual

Page 12

Advertising
background image

1. Push the → button when the cursor is on Sunday.

This will change the program to an “Interval Day”
schedule.

2. Push the + button to increment the “Interval”

indicating the desired number of days from 2 – 31
days between irrigation cycles.

3. Next, push the → button and the number of “Days

Left” will flash. Use the + or – buttons to choose the
number of days until you desire this irrigation cycle to
start. Number of “Days Left” will not exceed the
“Interval” schedule selected.

4. Rotate dial to “Run” to enter this data in controller.

UTILIZING “ODD OR EVEN” DAY SCHEDULING

“Odd” or “Even” day scheduling is typically used to comply
with regulatory watering rules. ODD/EVEN scheduling allows
you to irrigate on only “ODD” numbered or “EVEN”
numbered days of the month.

1. Follow the “Interval Day” watering schedule

instructions above utilizing steps 1 and 2 and set the
“Interval Day” to 1.

2. Push the → button to highlight option not desired

ODD or EVEN.

3. Push the – button to eliminate either the ODD or

EVEN schedule as a “No Water Days.” A circle will
appear above the eliminated choice. If EVEN is
selected as “No Water Days” only ODD numbered
days will irrigate. Select ODD as a “No Water Days”
and only Even numbered days will irrigate.

NOTE: If ODD days are active days, February 29 and the
31

st

of any month will not irrigate.

4. Rotate dial to “Run” to enter data in controller.

12

Advertising