Hit Products RainPro Expandable User Manual

Page 13

Advertising
background image

UTILIZING THE “NO WATER DAY” OPTION

(Only for overriding the ODD/EVEN or Interval Schedule for
a specific day or days of the week when you regularly desire
no irrigation to take place for maintenance or other reasons.)

1. Rotate dial to Calendar/Schedule
2. Press the → button until the cursor is on “Sunday.”

This will change the program to “Interval Day”
schedule.

3. Press the → button and the “Interval” will flash.
4. Push the → button again and the days of the week

“Mon” will flash.

5. Press the →button until the day you desire as a “No

Water Day” is flashing.

6. Press the – button to designate this day as a “No

Water Day.” This specific day will now be circled.

7. Repeat steps 6 and 7 for all desired “No Water Days”

on a weekly calendar.

8. Rotate dial to “RUN” to enter data in controller.

DIAL POSITIONS AND FUNCTIONS

RUN – Rotate the dial to the “RUN” position after
completing any programming to enter this new data in
controller. Leave the dial in the RUN position to have the
controller operate as programmed.
RAIN/OFF – Rotate the dial to the “RAIN/OFF” position to
stop all output of the controller. All irrigation will stop. To
return to normal operation, rotate dial back to “RUN.”

13

Advertising