CAMCORP CAM-AIRO Vertical Cartridge User Manual

Page 21

Advertising
background image

CAMCORP, INC.

Phone: 913-831-0740 Fax: 913-831-9271

www.camcorpinc.com

10 !,

)

65. 3

+ 24

Explosion Relief Panels – Shear Bolt Style (when used)

Inspect explosion relief vents (when used) for broken or damaged

explosion bolts. ASSURE THAT THERE ARE NO STEEL BOLTS USED

FOR THE INSTALLATION OF THE EXPLOSION RELIEF PANEL!!!

These bolts are made of special high tech poly-vinyl chloride and are

designed to relieve at a specific pressure. A magnet should be used to

check for steel bolts.

Explosion Relief Panels – Rupture Style (when used)

Inspect explosion relief vents for cracks and that all mounting bolts are

tight.

Compressed Air System

The pulse timer board must be correctly wired and mounted in its

enclosure in a suitable location.

All the ¼” copper or nylon tubing connections between the diaphragm

and the solenoid valves must be tight and the tubing must not be

crimped.

The plugs (when used) must be removed from the exhaust ports of the

solenoid valves and the tubing from the diaphragm valves must be

connected to the “IN” port on the solenoid valves.

The compressed air supply system must be equipped to supply clean, dry

air to the pulsing air system. At this time assure that there is a suitable air

pressure gauge on the air header for reading 0-160 psig.

Start the compressed air supply system and check for air leaks in all parts

of the system. If air is heard escaping through one or more of the

blowpipes (with the timer off), please refer to the “Troubleshooting the

Compressed Air System” section of this manual. Gauge pressure at the

compressed air manifold(s) should be 80-90 psig.

4-3

Advertising