Operating instructions – Vermont Casting LHERDV20 User Manual

Page 13

Advertising
background image

13

10004894

LHEDV Series Direct Vent Insert

Operating Instructions

General Glass Information

Only ceramic glass approved by CFM Cor-
poration may be used for replacement on
this unit.

1. The use of substitute glass will void all product

warranties.

2. Care must be taken to avoid breakage of the glass.
3. Under no circumstances should this appliance be

operated without glass properly installed, or with any
cracked or broken glass. Replacement of any glass
assembly as supplied by the manufacturer should be
done by a licensed qualified service person.

Louvre Removal

To remove
louvre, lift louvre
up and then pull
out.
(Fig. 20)

Glass Cleaning

It will be necessary to clean the glass periodically.
During start-up condensation, which is normal, forms on
the inside of the glass and causes lint, dust and other
airborne particles cling to the glass surface. Also initial
paint curing may deposit a slight film on the glass. It is
therefore recommended that the glass be cleaned two
or three times with a non-ammonia household cleaner
and warm water (we recommend gas fireplace glass
cleaner). After that the glass should be cleaned two or
three times during each heating season depending on
the circumstances present.

Clean glass after first two weeks of opera-
tion.

Glass Frame Removal

LHECDV20 and LHERDV20
1. Remove two (2) screws at the bottom of the frame.

(Fig. 17)

2. Lift up and unhook glass frame at the top.

Log Installation and Burner Lava Rock

1 . Remove glass frame. (See "Glass Removal" section)
2. Remove logs from packaging.
3. Place logs according to the model instructions be-

low:

LHECDV20, LHERDV20 (Fig. 22)

a. Place rear left log (JR7). Use the log's bottom

holes to locate it onto one pin stud of the rear log
bracket on the left and the other end of the log
will sit on top of the lid of the left log support.

b. Place rear right log (JR8). Use the log's bottom

holes to locate it onto the two (2) pin studs of the
rear log bracket on the right.

c. Place the front left log (JR9). Position the log

notch against the second grate from the left, and
the other edge of the log on top of the rear left log
notch. Ensure the log is secure in place.

d. Place the front right log (JR10). Position the log

notch against the third grate from the right, and
the other edge of the log on top of the rear right
log notch. Ensure the log is secure in place.

1.

2.

Louvre

Glass Panel

FP444

Fig. 20 Louvre removal.

LHECDV30 and LHERDV30
1. Unhook the frame window by pulling the handle of

the two (2) latches at the bottom part of the window
frame; pull the left side latch counterclockwise and
the right side latch, clockwise. (Fig. 21)

2. Lift and unhook the glass frame at the top.

FP1327

window frame removal

4/3/03 djt

Machine Screw

Fig. 21 Remove glass frame.

Latch

FP1328

Advertising
This manual is related to the following products: