4 monitoring of test resources, 5 basic safety precautions, 2 personnel training – KERN & SOHN ABT 220-5DM User Manual

Page 12: 6 transport and storage, 1 testing upon acceptance

Advertising
background image

ABT-BA-e-1312

12

4.4 Monitoring of Test Resources
In the framework of quality assurance the measuring-related properties of the bal-

ance and, if applicable, the testing weight, must be checked regularly. The responsi-

ble user must define a suitable interval as well as type and scope of this test. Infor-

mation is available on KERN’s home page (www.kern-sohn.com with regard to the

monitoring of balance test substances and the test weights required for this. In

KERN’s accredited DKD calibration laboratory test weights and balances may be

calibrated (return to the national standard) fast and at moderate cost.

5 Basic Safety Precautions

5.1 Pay attention to the instructions in the Operation Manual
Carefully read this operation manual before setup and commissioning, even if you

are already familiar with KERN balances.

5.2 Personnel training
The appliance may only be operated and maintained by trained personnel.

6 Transport and storage

6.1 Testing upon acceptance
When receiving the appliance, please check packaging immediately, and the appli-

ance itself when unpacking for possible visible damage.

Advertising
This manual is related to the following products: