LAARS 9600 CB & HWG - Service Manual User Manual

Page 18

Advertising
background image

Page 18

LAARS Heating Systems

RESET BOILER CONTROL BY
SWITCHING POWER OF FOR 15
SECONDS AND THEN ON AGAIN

WITH A CALL FOR HEAT / HOT
WATER AFTER APPROX. TWO
SECONDS GREEN LIGHT COMES
ON AND BLOWER STARTS

AFTER FIVE MINUTES RED
"PURGE" LIGHT FLASHES

STACK SWITCH CONTACTS
NOT CLOSING CHECK FOR
FLUE BLOCKAGE (SNOW,
LEAVES ETC.) AGAINST
VENT TERMINAL

CYCLE BOILER MANY TIMES
TO TRY TO CREATE A
MALFUNCTION

CLEAR BLOCKAGE AND
RECYCLE BOILER

CHECK STACK SWITCH

BLOCKAGE
EXISTS

NO
BLOCKAGE

NO

YES

YES

NO

RED "PURGE" LIGHT FLASHING

(YOU MUST COMPLETE PAGE 16 FIRST)

AFTER 45 SECONDS RED
"PURGE" LIGHT FLASHES

AFTER 5 MINS

RED "PURGE"

LITE FLASHES

NO

CHECK BLOWER PAGE 20

YES

SHUT OFF POWER, DISCONNECT
WIRES TO STACK SWITCH, TURN
ON POWER - AFTER TWO SEC-
ONDS BLOWER STARTS

RECONNECT STACK
SWITCH WIRES.
CHECK BLOWER

CHECK STACK SWITCH

YES

NO

YES

Advertising