Checking blower (you must complete page 16 first) – LAARS 9600 CB & HWG - Service Manual User Manual

Page 20

Advertising
background image

Page 20

LAARS Heating Systems

WITH A CALL FOR HEAT RESET
BOILER CONTROL BY SWITCHING
OFF BOILER SWITCH FOR 15 SECS.

AFTER TWO SECONDS GREEN
POWER LIGHT COMES ON.

REFER TO GENERAL TROUBLE
SHOOTING SECTION PAGE 16

CONNECT MANOMETER TO "PRESSURE TAP" ON
GAS VALVE - PRESSURE DURING BLOWER
OPERATION WITHOUT GASFLOW (VALVE/FLAME
LIGHT NOT LIT) IS - 4 IN. W.C.

CHECK FOR VOLTAGE 120 VAC
AT BLOWER WIRE CONNECTOR
(WITHIN 5 MINS. AFTER GREEN
LIGHT)

BLOWER O.K.

REPLACE BLOWER

BLOWER STARTS

YES

YES

NO

YES

NO

NO

CHECKING BLOWER

(YOU MUST COMPLETE PAGE 16 FIRST)

REPLACE BLOWER

0 VOLTS

120 VAC

CHECK TT, LIMITS,
STACK SWITCH

REPLACE BOILER
CONTROL 2400-224

REFER TO PAGE 17
REFER TO PAGE 19

OK

OPEN

Advertising