Install a correctly sized expansion or

compression tank with suitable air charger and

tank drainer, as appropriate.

5.

Support the weight of all water and gas piping by

suitable hangers or floor stands.

6.

Check piping diagrams with local applicable

plumbing, heating and building safety codes.

2.9 Filling The System

1.

Ensure the system is fully connected. Close all

bleeding devices and open make-up water valve.

Allow system to fill slowly.

2.

If make-up water pump is employed, adjust

pressure switch on pumping system to provide a

minimum of 12 psi (81.8 kPa) at the highest

point in the heating loop.

3.

If a water pressure regulator is provided on the

make-up water line, adjust the pressure regulator

to provide at least 12 psi (81.8 kPa) at the

highest point in the heating loop.

4.

Open bleeding devices on all radiation units at

the high points in the piping throughout the

system, unless automatic air bleeders are

provided at such points.

5.

Run system circulating pump for a minimum of

30 minutes with the boiler shut off.

6.

Open all strainers in the circulating system,

check flow switch operation, and check for

debris.

3-Way Valve No. 1
Change-Over
(Heating and Cooling)

3-Way Valve No. 2
To By-Pass
Both Heater and
Chiller

To
System

From
System

By-Pass

To Boiler
and
Chiller

From
Boiler

Valve Motors
2-Pos
3-Wire - 24V

115/24V

Transformer

DPDT Manual or Automatic
Change-Over Switch
DPDT - Set at Change-Over
Temperature

Clock Timer
Auto-Resetting
Set at 15 Minute SPDT

Suggested Wiring Diagram For

Tempering System Water at

Changeover From Heating To Cooling

Figure 6. Boiler-Chiller Installation.

From
Chiller

7.

Recheck all air bleeders as described in Step 4

above.

8.

Check liquid level in expansion tank. With the

system full of water and under normal operating

pressure, the level of water in the expansion tank

should not exceed 1/4 of the total, with the

balance filled with air.

9.

Start up boiler according to procedure described

in Section 3.1. Operate the entire system,

including the pump, boiler, and radiation units

for one (1) hour.

10. Recheck the water level in the expansion tank. If

the water level exceeds 1/4 of the volume of the

expansion tank, open the tank drainer and drain

to that level.

11. Shut down the entire system and vent all

radiation units and high points in the system

piping as described in Step 4 above.

12. Close make-up water valve and check strainer in

pressure reducing valve for sediment or debris

from the make-up water line. Reopen make-up

water valve.

13. Check gauge for correct water pressure and also

check water level in the system. If the height

indicated above the boiler insures that water is at

the highest point in the circulating loop, then the

system is ready for operation.

Make-Up
Water
Supply

Check
Valve

Pressure
Reducing
Valve

Blow Down
Valve

Expansion
Tank

To Drain

Method 1

To
Drain

Method 2

To
System

Strainer

Pump

Thermometer

Temperature
and Pressure
Gauge

NOTES: Select Method 1 or 2 when using low water cutoff accessory:
1. Under Method 1, the low water cutoff is furnished by Laars and

shipped as a separate item for fieldinstallation.

2. Under Method 2, electronic low water cutoff isinstalled, wired and

tested on boiler in Laars factory.

3. Preferred locaiton of system pump is shown. Compression tank must

always be on suction side of pump.

Figure 7. Boiler Piping.

Air Changer
and Tank
Drainer

OUT OF

PRODUCTION