Out of production – LAARS Mighty Max HH (Sizes 320M - 400M) - Installation, Operation and Maintenance Instructions User Manual

Page 12

Advertising
background image

Page 12

LAARS Heating Systems

the latest edition of ANSI Z223.1/NFPA 54. In

Canada, installation must be in accordance with CSA

B149.1, and applicable local codes.

There are a variety of ways to provide venting

and combustion air for the boiler (see Figure 8).

The Mighty Max HH boiler is certified as a true

direct vent unit when installed according to the

instructions for horizontal venting and ducted

combustion air. This can be done even if the runs are

vertical.

2.11Top-to-Rear Vent Collar Conversion

The Mighty Max HH boiler is shipped with the

vent collar on top of the heater. Follow this procedure

to convert it for rear connection (see Figure 9).

Figure 9. Top-To-Rear Vent Collar.

Adapter Plate

Top Panel

Vent

Collar/Stack

Blank Plate

(Boiler

Jacket)

Blank Plate On

Flue Collector

Blank Plate On

Boiler Jacket

Top Panel

1. Removal of Blank Plate and Adapter

Plate From Boiler

3. Blank Plate Placement

Over Stack Top Opening

Blank Plate

(Flue

Collector)

Vent

Collar/Stack

2. Removal of Blank Plate From

Rear of Flue Collector

4. Connecting Vent Collar/Stack

to Flue Collector

14. Within three (3) days of start-up, recheck all air

bleeders and the expansion tank as described in

Steps 4 and 8 above.

IMPORTANT

The installer is responsible for identifying to the
owner/operator the location of all emergency
shutoff devices.

2.10Venting and Combustion Air

Information

Provisions for venting and supply of air for

venting and combustion must be done in accordance

with these instructions and applicable requirements of

OUT OF

PRODUCTION

Advertising