Longshine LCS-KL-2716M User Manual

Page 18

Advertising
background image

17

To Install cascade chain, please follow the instruction below:

A. Please turn off computers and devices when you start to install KVM

Switch.

B. Use the custom combo cable set (See

Figure 6

), to connect one or more

Slave KVM Switches to any PC port of Master KVM Switch. The

connection between KVM to KVM must be connected through PS/2

connection. ( Please refer to

Figure 7 & Figure 8

).

C. You can do console Master KVM Switch via either USB and/or PS/2

keyboard and mouse at will.

D. Plug in the power adapter of the first level Master KVM Switch and

connect Master KVM switch to computers.

E. Next, plug in power adapter for each level Slave KVM Switch and connect

Slave KVM switch to computers .

F. The power on sequence should be:

1.

Master KVM Switch

2.

Second level Slave KVM Switch (connecting to Master KVM Switch) if

any.

3.

Third level Slave KVM Switch (connecting to second level Slave KVM

Switch) if any.

4.

All computers connecting to Master/Slave KVM Switch.

G. After all KVM Switches are powerd by power adaptor, trun on the

computers.

Initial Plug-in Process:

Please plug in the Master KVM Switch first before turning on any

other devices like montior or computers.

Hot plug and Hot Swap:

Combo Free 8-port & 16-port KVM switch support Hot plug and Hot swap

function.

Advertising
This manual is related to the following products: