18

U1VA6060209

6. Final Check List

1) Is the icemaker level?

2) Is the icemaker in a site where the ambient temperature is within 45°F (7°C) to 100°F

(38°C) and the water temperature within 45°F (7°C) to 95°F (35°C) all year around?

3) Have all shipping tape(s), string and packing been removed from the icemaker?

4) Are all components, fasteners and thumbscrews securely in place?

5) Have all electrical and piping connections been made?

6) Has the power supply voltage been tested or checked against the nameplate rating?

Has a proper ground been installed to the icemaker?

7) Are the water supply line shut-off valve and drain valve installed? Has the water supply

pressure been checked to ensure a minimum of 10 PSIG (0.7 bar) and a maximum of
113 PSIG (7.5 bar)?

8) Have the compressor hold-down bolts and all refrigerant lines been checked against

vibration and possible failure?

9) Has the bin control thermostat been checked for correct operation?

10) Has the user been given the Instruction Manual and instructed on how to operate the

icemaker and the importance of the recommended periodic maintenance?

11) Has the user been given the name and telephone number of an authorized service agent?

7. Startup

* Check that shipping tape(s), string and packing are removed before starting the icemaker.

1) Clean inside the storage bin and door.

2) Open the water supply line shut-off valve and plug in the icemaker.

3) Move the control switch to the “ICE" position.

* The freezing cycle will start automatically.