Sears 300 User Manual

Page 11

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

20. Feed the Short Cable (44) around one of the

4 1/2” Pulleys (85).

Feed the Short Cable (44) up over the 3 1/2”
Pulley (12) in the Pivot Arm (91) as shown.

21. AtUch the S'.'.oi; Cha,;. (52) L ;t-jVc.3ri the Short

Cable (44) and the 3/8” Eyebolt (55) in the Small
Weight Cover (54) with two Cable Clips (53).

22. Attach a 3/8” x 3 3/4” Bolt (83), two 3/8” Washers

(4), the 1/2” X 1 1/4” Spacer (84), and a 3/8” Jam
Nut (2) to the lower hole in the Squat Upright
(71).

Find the end of the Long Cable (45) where the
rubber ball is located. Route the Long Cable up

around a 3 1/2” Pulley (12). Attach the Pulley to
the indicated side of the Squat Upright (71) with a
3/8”

X

3 1/2” Bolt (82), a 3/8” Flat Washer (4), and

a 3/8” Jam Nut (2).

Note: Make sure that the

Long Cable is between the Pulley and the 1/2”
X 1 1/4” Spacer (84).

23. Lay the Long Cable (45) over a 3 1/2” Pulley (12).

Attach the Pulley and two Pulley Covers (13) to
the Squat Arm (72) with a 3/8” x 3 1/4” Bolt (5)
and a 3/8” Jam Nut (2). Make sure that the Pulley

is attached to the indicated side of the Squat Arm.

Make sure that the Pulley Covers are turned

so the wide tabs are positioned as shown.

11

Advertising