Do not fully tighten the jam nuts yet – Sears 300 User Manual

Page 6

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

5. Attach the Frame (80) to the two 3/8" x 2 3/4"

Carriage Bolts (1) in the Base (43) with two 3/8”
Jam Nuts (2).

Do not fully tighten the Jam Nuts yet.

Insert the Frame Cap (88) into the indicated end

of the Frame (80). Attach the Frame Cap, the
VKR Upright (70), and the Squat Upright (71) to
the Frame with the two 3/8” x 3” Bolts (7) and two
3/8” Jam Nuts (2).

Tighten all of the 3/8” Jam Nuts (2) used in
assembiy steps 1 through 5.

6. Attach the upper ends of the Weight Guides (51)

to the Frame (80) with the 5/16” x 6 1/2” Bolt (79),

the two 1/2" X 3/4" Spacers (iOO), four 5/i6" Fiai

Washers (60), and the 5/16” Jam Nut (106), as
shown.

Advertising