Do not fully tighten the jam nuts yet – Sears 300 User Manual

Page 5

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

3.

Attach the Squat Upright (71) to the two indicated
3/8” X 2 3/4” Carriage Bolts (1) in the Stabilizer

(69) with two 3/8” Jam Nuts (2).

Do not fully tighten the Jam Nuts yet.

Tap a 2” X 2” Inner Cap (78) into the Squat

Upright (71). Attach a Rubber Bumper (20) to the
Squat Upright with a #8 x 1/2” Tap Screw (21).

4.

Insert two Weight Bushings (104) into each of the
nineteen Weights (46).

Slide two Weight Bumpers (47) onto the lower
end of each Weight Guide (51) (there is a hole
near the upper end of each Weight Guide). Insert
the Weight Guides into the holes in the indicated
bracket on the Base (43).

Slide the Weights (46) onto the Weight Guides
(51). Turn the Weights so that the deep pin
grooves are underneath the Weights, and are on
the indicated side.

Slide the Small Weight (103) onto the Weight
Guides (51). Insert the Weight Selector (48) into
the Weights (46).

Advertising