If the 208/230-v unit is to be connected to a 208-v power sup-
ply, the transformer must be rewired by moving the black wire
with the

1

/

4

-in. female space connector from the 230-volt con-

nection and moving to the 200-volt

1

/

4

-in. male terminal on the

primary side of the transformer.

Refer to unit label diagram for additional information. Pig-

tails are provided for field wire connections. Use factory-
supplied splices or UL (Underwriters’ Laboratories) approved
copper/aluminum connector.

When installing units, provide a disconnect per the NEC.
All field wiring must comply with NEC and local

requirements.
Install field wiring as follows:

1. Install conduit through side panel openings. Install con-

duit between disconnect and control box.

2. Install power lines to terminal connections as shown in

Fig. 7.

Voltage to compressor terminals during operation must be

within voltage range indicated on unit nameplate (see
Tables 1A-1H). On 3-phase units, voltages between phases must
be balanced within 2% and the current within 10%. Use the for-
mula shown in the legend for Tables 1A-1H, Note 2 to deter-
mine the percent of voltage imbalance. Operation on improper
line voltage or excessive phase imbalance constitutes abuse and

may cause damage to electrical components. Such operation
would invalidate any applicable Carrier warranty.
FACTORY-SUPPLIED NON-FUSED DISCONNECT — The
factory-supplied disconnect is capable of handling disconnect
amps up to 80 A for a COBRA Energy Recovery unit. For dis-
connect amps greater than 80 A, a field-supplied disconnect is
required.
FIELD CONTROL WIRING — Install a Carrier-approved
accessory thermidistat assembly according to installation
instructions included with the accessory.
Locate thermidistat as-
sembly on a solid wall in the conditioned space to sense average
temperature in accordance with thermidistat installation instruc-
tions on page 30. Connect thermidistat wires to terminal board.

Route thermidistat cable or equivalent single leads of col-

ored wire from subbase terminals through connector on unit to
low-voltage connections (shown in Fig. 8). Thermidistat con-
trol wiring is routed to both the rooftop unit control box and the
energy recovery section control box.

If a PremierLink™ control is used, a thermidistat does not

need to be used. A humidistat and a separate room air sensor
are used. Two extra terminal blocks (TB2 and TB3) are provid-
ed in the control box for all units with PremierLink controls.
No wiring should be directly connected to the PremierLink
control. Wire sensors to TB2 or TB3. Humidistat is wired to
TB1 and energy recovery section control box.

Fig. 6B — Rigging Label — COBRA™ Energy Recovery Unit — Sizes 48/50HJ008-014

MAX WEIGHT

A

B

C

lb

kg

in.

mm

in.

mm

in.

mm

48HJ008 w/62AQ200

1310

595

77.42

1966.5

66.50

1689.10

42.12

1070

48HJ008 w/62AQ300

1355

616

77.42

1966.5

66.50

1689.10

42.12

1070

48HJ009 w/62AQ200

1315

597

77.42

1966.5

66.50

1689.10

42.12

1070

48HJ009 w/62AQ300

1360

618

77.42

1966.5

66.50

1689.10

42.12

1070

48HJ012 w/62AQ200

1400

636

77.42

1966.5

66.50

1689.10

50.12

1273

48HJ012 w/62AQ300

1445

657

77.42

1966.5

66.50

1689.10

50.12

1273

48HJ014 w/62AQ200

1440

655

77.42

1966.5

66.50

1689.10

50.12

1273

48HJ014 w/62AQ300

1485

675

77.42

1966.5

66.50

1689.10

50.12

1273

50HJ008 w/62AQ200

1240

564

77.42

1966.5

66.50

1689.10

42.12

1070

50HJ008 w/62AQ300

1285

584

77.42

1966.5

66.50

1689.10

42.12

1070

50HJ009 w/62AQ200

1245

566

77.42

1966.5

66.50

1689.10

42.12

1070

50HJ009 w/62AQ300

1290

586

77.42

1966.5

66.50

1689.10

42.12

1070

50HJ012 w/62AQ200

1325

602

77.42

1966.5

66.50

1689.10

42.12

1070

50HJ012 w/62AQ300

1370

623

77.42

1966.5

66.50

1689.10

42.12

1070

50HJ014 w/62AQ200

1345

620

77.42

1966.5

66.50

1689.10

42.12

1070

50HJ014 w/62AQ300

1410

641

77.42

1966.5

66.50

1689.10

42.12

1070

Advertising