Step 15, Ridge cap & panels – Arrow Storage Products CM1014 User Manual

Page 28

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Step 15

• Parts Needed For •

Ridge Cap & Panels

• 9983 Left Roof Panel (1)

• 7743 Roof Panel (2)
• 6797 Ridge Cap (1)

1

Install a left roof pane! 9983atthe

left rear corner of the roof.

2

Cover the joint at the peak with

weather stripping tape. Unroll the
tape and press itdownovertheopen-

ing at the ridge as you install each
roof panel. Do not cut the tape at this

time.

3

Install two roof panels 7743 work­

ing side to side.

Do not fasten the

lower end of the panels to the side

wall angles at this time.

Continue

weather stripping the ridge opening.

Screws To
Roof Beam

f

Fasten at ^

Overlap With

Bolt

Screws To
Roof Beam

i

o

If

Fasten

At

* Overlap With

Bolt

NOTE

Narrow roof panel crimped rib is

overlapped by wide rib of

adjacent panel where possible

Do not fasten

at this time

4

Install the first ridge cap 6797 on

STEP

STEP

4

5

Advertising
This manual is related to the following products: