Step 20, Door installation & adjustment – Arrow Storage Products CM1014 User Manual

Page 33

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

step 20

• París Needed For •

Door Installation & Adjustment

Right Door Assembly (1)

Left Door Assembly (1)

SQ33

1 From inside the building, put the

bottom of the rightdoorassembly (on

your left when you are inside the

building) behind door jamb into the

front frame track.

2

Position the top of the door so that

the holes in the door line up with the

holes in the door slides.

3

Fasten the door to the door slides

using a #10Bx1/2" screw.

STEP

NOTE

The four holes in the top of each

door allow you to adjust the

doors. Place the door slide in

the middle 2 holes.

4

Repeat steps 1 through 3 for the

left door.

Advertising
This manual is related to the following products: