Basic requirements, operational safety – CIRCUTOR DHB Series User Manual

Page 7

Advertising
background image

7

3. BASIC REQUIREMENTS, OPERATIONAL

SAFETY

In the safety service scope, the meter meets the requirements of the EN
61010-1 standard.

Observations concerning the operational safety
· All operations concerning transport, installation, and commissioning
as well as maintenance, must be carried out by qualified, skilled
personnel, and national regulations for the prevention of accidents
must be observed.
· The programming of DHB-3xx meter parameters must be carried
out
after disconnecting measuring circuits
· Before switching the meter on, one must check the correctness of
connections to the network.
· Do not connect the meter to the network through
an autotransformer.
· Before removing the meter housing, one must switch the supply
off and disconnect measuring circuits.
· The removal of the meter housing during the guarantee contract
period may cause its cancellation.
· The meter fulfills requirements related to electromagnetic
compatibility in the industrial environment
· When connecting the supply, one must remember that a switch or
a circuit-breaker should be installed in the building. This switch
should be located near the device, easy accessible by the
operator, and suitably marked as an element switching
the meter off.
· Non-authorized removal of the housing, inappropriate use, incorrect
installation or operation, creates the risk of injury to personnel or
meter damage. For more detailed information, please study the

Advertising