Split feed operation – Tempest TornadoRetrofit Kits User Manual

Page 15

Advertising
background image



Tornado Enclosure User Manual

page 15

Split Feed Operation

Enclosure and luminaire have separate electrical feeds.
The enclosure circuit must be powered ON 24/7.

When splitting the feeders, both circuits should be on the same phase and at the same supply

voltage.

1 Use a wire cutter to cut the copper links on the

DEC3.2 board in four places.

2 Connect incoming ENCLOSURE power to the

terminals labeled MAINS. This supply MUST be

maintained 24/7.

(E) Earth/Ground (L) Live

(N) Neutral

3 Connect incoming LUMINAIRE power to the

terminals labeled SPLIT:

(E) Earth/Ground (L) Live

(N) Neutral

Projector Supply

(split mode)

Enclosure Supply
(100-250VAC 50/60Hz)

Fan 1

Fan 2

Heater(s)

Projector

receptacle

Cut here for split

supply operation

E L N

Luminaire

Power

E L N

Enclosure

Power

Advertising