Basler Electric RDP-110 User Manual

Page 15

Advertising
background image

9318100990 Rev H

7

7.

After applying the new labels, insert each label card into the appropriate panel slot. Ensure that
each label card is oriented properly by viewing the custom labels through the label windows of the
front panel.

8.

Move the panel assembly adjacent to the conduit box and reconnect the cables to the two circuit
board connectors.

9.

Secure the front panel to the conduit box with the four Phillips screws removed in step 3.
Maximum torque for these screws is 17 inch-pounds or 2 newton meters.

10.

If desired, verify the function of the reprogrammed indicators before returning the RDP-110 to
service.

RDP-110

1BControls and Indicators

Advertising