MENBLOC 60Hz USER INSTRUCTIONS ENGLISH 71559945 - 02/13

Page 28 of 36

flowserve.com

Our specialist service personnel can help with
preventative maintenance records and provide
condition monitoring for temperature and vibration
to identify the onset of potential problems.

If any problems are found the following sequence
of actions should take place:
a) Refer to section 7, Faults; causes and

remedies, for fault diagnosis.

b) Ensure equipment complies with the

recommendations in this manual.

c) Contact Flowserve if the problem persists.

6.2.1 Standard maintenance

Roller bearing

The bearings fitted are prepacked with grease at
the factory. When the regreasing period is reached
it is necessary to remove as much of the old
grease as possible with a clean lint free cloth and
repack the bearings with fresh grease.

MAINTENANCE

OPERATION

FREQUENCY

OBSERVATIONS

Starting (example
of a stand-by
pump)

Weekly

Check the running
state

Evacuation of
condensation
water closed IP 55
motor

Weekly

Increase

frequency for
frequent
stops/starts

See figure 1

below

Lubrication of all
bearing types

Greased for life

If motors fitted
with grease nipple,
lubrication of
motor bearings

Every 3750 hours

of operation

Put 15 g (0.53

oz) of ESSO
UNIMEX N3 or
similar grease for
each grease
nipple with the
electro-pump set
stopped.

See figure 2

Open and replace the plastic plugs located

under the casings.

p lu g

Fig. 1 Evacuation of condensation water

G re a s e n ip p le G re a s e n ip p le

Fig. 2 Bearing lubrication

6.2.2 Routine inspection (daily/weekly)

The following checks should be

made and the appropriate action taken to remedy
any deviations:

a) Check the behavior of the pump while running:

noise level, vibrations, bearings temperature,
flow rate and pressure.

b) Motors with sealed for life bearings require no

maintenance. If grease nipples are fitted,
check running hours since last recharge of
grease or carry out a grease change.

6.2.3 Periodic inspection (six monthly)

a)

Check foundation bolts for

security of attachment and corrosion.

b) Check pump-running records for hourly usage

to determine if bearing lubricant requires
changing.