Commissioning procedure – Flowserve OR 52-5 User Manual

Page 23

Advertising
background image

23

Commissioning Procedure

continued

First Commissioning

1. Switch on measuring transducer

(disconnecting switch).

2. Rinse measuring transducer ORG 12/22 for at

least 15 minutes and operate cleaning device
if necessary.

3. Make sure that the ORG 12/22 is completely free of

air. For visual inspection undo union nuts (inside) and
remove light receiver . When screwing the light
receiver in again make sure that the locating pin
fits exactly in the corresponding groove at the front
collar of the light receiver .

0 % Calibration

Use tap water (with low fluid temperature) or oil-free condensate as turbidity zero.
1. Press until yellow P-LED lights up.
2. Use

to change the LED display until the

calibration LED 0 lights up. The calibration value
(digits) saved last will be indicated.

3. Press , the yellow P-LED and the 7-segment

display are flashing.

4. Press , the 0 % value is saved as basic turbidity.

The P-LED and the 7-segment display are illuminated.
If the basic turbidity is too high an error message
will pop up.

5. Press , the equipment returns to normal operation, 0 ppm is indicated and the LED

for ppm is illuminated.

To cancel press twice, the yellow P-LED will light up again.

ALARM

1

2

ppm

sec

cal

0

OIL

Test

P

E

H

D

D

ALARM

1

2

ppm

sec

cal

0

OIL

Test

P

E

P

P

E

E

P

Advertising
This manual is related to the following products: