Commissioning Procedure

continued

Adjusting time delay for alarm 1

1. Press , the yellow P-LED lights up.
2. Use

to change the LED display until LED Alarm 1

and LED ppm light up. The value saved last is shown.

3. Press , the yellow P-LED and the second digit of the

7-segment display are flashing.

4. Use

to change the digit, press to save the

setting and move to the third digit. The third digit is
now flashing.

5. Use

to change the digit, press to save the

setting. The yellow P-LED and the 7-segment display
are illuminated. A max. time delay of 20 sec. can be adjusted.

6. Press , the equipment returns to normal operation, the actual value is indicated and

the LED ppm is illuminated.

Adjusting time delay for alarm 2

1. Press , the yellow P-LED lights up.
2. Use

to change the LED display until LED Alarm 2

and LED ppm light up. The value saved last is shown.

3. Press , the yellow P-LED and the second digit of the

7-segment display are flashing.

4. Use

to change the digit, press to save the

setting and move to the third digit. The third digit is
now flashing.

5. Use

to change the digit, press to save the

setting. The yellow P-LED and the 7-segment display
are illuminated. A max. time delay of 20 sec. can be adjusted.

6. Press , the equipment returns to normal operation, the actual value is indicated and

the LED ppm is illuminated.

ALARM

1

2

ppm

sec

cal

0

OIL

Test

P

E

P

P

E

E

E

ALARM

1

2

ppm

sec

cal

0

OIL

Test

P

E

P

P

E

E

E

Advertising
This manual is related to the following products: