Chapter 5: maintenance, 1 preventative maintenance schedule – AEC Colortronic MSH Series 2039 User Manual

Page 21

Advertising
background image

C Series Granulators

Maintenance

21 of 53

Chapter 5: Maintenance

5-1 Preventative Maintenance Schedule

Check

Frequency

Check tightness of cutting chamber hold-down fasteners
(Refer to Section 3-6 on page 16)

Daily

Check the tightness of screen cradle retainer knobs
(Refer to Section 5-4 on page 23)

Daily

Check infeed flap position/condition (replace if necessary)

Daily

Check position and condition of interlock actuator screws
(Refer to Section 3-6 on page 16 and Section 5-4 on page 23)

Daily

Do housekeeping around work area

Daily

Check tightness of upper chamber pivot arm screws
(520 NM, 366 ft. lbs.)

Weekly

Check jackscrew travel adjustment: internal limit switches and chamber
mounting bracket limit switch
(Refer to Sections 5-5 and 5-6 on pages 25 - 28.)

Weekly

Check that pivot pins and locknuts for jackscrews are tight
(Refer to Sections 5-5 and 5-6 on pages 25 - 28.)

Weekly

Inspect overall condition of jackscrews
(Refer to Sections 5-5 and 5-6 on pages 25 - 28.)

Weekly

Check zero speed sensor operation
(Refer to Section 5-6 on page 26)

Weekly

Check knife clearance and wear.
(Refer to Section 5-8 on page 32)

Weekly

Check that rotor and bed knife bolts have proper torque
(640 NM, 472 ft. lbs.)

Weekly

Check lubrication. More frequent lubrication may be required
(Refer to Section 5-2 on page 22)

Monthly

Check belt tension (Refer to Section 5-10 on page 35)

Monthly

Turn screens front to back (Refer to Section 5-4 on page 23)

Monthly

Advertising
This manual is related to the following products: