Replacement of electrical components – AIRLESSCO TS1500 User Manual

Page 17

Advertising
background image

Maintenance

3A1183D

17

NOTE: O-ring (207) is not required for safe pump opera-
tion.

10. Reassemble intake valve with new O-ring (227),

seat (212) and ball (214), Seat may be flipped over
and used on other side. Clean seat thoroughly.

11. Install intake valve on cylinder. If a wrench is used

torque as follows:

80 +/-5-ft-lb

If a wrench is not used, be sure intake valve is bottomed
out against cylinder.

12. Torque packing nut (202) down onto adjustment

spacer (228) 100 +/-10 in-lb.

Remove throat adjustment spacer (228) when pump
packings begin to leak after much use. Then tighten
packing nut down until leakage stops or lessens. This
allows approximately 100 gallons of additional operation
before a repacking is required.

Replacement of Electrical
Components

Pressure Control Assembly (Electrical
Control Board)

1. Unplug machine’s power cord.

2. Remove screws and lower the pressure control

assembly.

3. Disconnect all leads from pressure control assem-

bly.

4. Reassemble in reverse order.

Sensor

1. Remove the screws and lower the pressure control

assembly.

2. Disconnect sensor lead from the board.

3. Unscrew sensor from pressure control assembly

using a 3/4” wrench.

4. Reassemble in reverse order. Use PTFE tape on

the sensor threads prior to reinstalling it into the
pressure control assembly.

207

221

7582a

214

212

227

7570f

7569a

Always unplug the electrical cord before servicing the
machine.

202

228

7568a

Advertising