1 gener al inf or mation on cy cles – HEIDENHAIN TNC 410 User Manual

Page 134

Advertising
background image

121

HEIDENHAIN TNC 410

Calling the cycle

Prerequisites

The following data must always be programmed before
a cycle call

BLK FORM for graphic display (needed only for test

graphics)

Call the tool

Direction of spindle rotation (M functions M3/M4)

Cycle definition (CYCL DEF).

For some cycles, additional prerequisites must be
observed. They are described with the individual cycle.

The following cycles become effective automatically as soon as
they are defined in the part program. These cycles cannot and must
not be called:

Cycles for circular and linear hole patterns

SL cycle CONTOUR GEOMETRY

Coordinate transformation cycles

DWELL TIME cycle

All other cycles are called as described below.

If the TNC is to execute the cycle once after the last programmed
block, program the cycle call with the miscellaneous function M99
or with CYCL CALL::

ú

To program the cycle call, press the CYCL CALL key.

ú

Press the CYCL CALL soft key to enter a cycle call.

ú

Enter a miscellaneous function M or press END to end
the dialog.

If the TNC is to execute the cycle automatically after every
positioning block, program the cycle call with M89 (depending on
machine parameter 7440).

To cancel M89, enter

M99 or

CYCL CALL or

CYCL DEF

Working with the secondary axes U/V/W

The TNC performs infeed movements in the axis
that was defined in the TOOL CALL block as the
spindle axis. It performs movements in the working
plane only in the principle axes X, Y or Z. Exceptions:

you program secondary axes for the side lengths
in cycles 3 SLOT MILLING and 4 POCKET
MILLING

you program secondary axes in the contour
geometry subprogram of an SL cycle.

8.1 Gener

al inf

or

mation on Cy

cles

Advertising