3.3

AGS Functional Tests

After all electrical connections

to the AGS, batteries, and generator

have been

completed (and prior to connecting the 8-pin green terminal block into the

AGS controller), perform the following tests to verify that the AGS system

is functioning correctly and the wiring from the AGS to generator is correct.
If the AGS fails either test, or the STATUS indicator turns red (indicating a

fault), refer to the Troubleshooting section.
3.3.1 Power-Up

Test

1. Ensure the AGS remote switch is set in the OFF position (center position)

and connected to the controller by the communication cable.

2. Before connecting the 8-pin green terminal to the AGS, use a multimeter

to verify the correct polarity and to ensure that the voltage to Terminals

3 (positive) and 4 (negative) is correct according to the position the DC

input jumper (refer to Figure 3-2).

3. Apply power to the AGS by plugging in the green 8-port friction-fi t terminal

block into the controller, and then verify that the green READY indicator

comes on (solid) and the STATUS indicator blinks green once.

Info: The READY indicator blinks when the AGS controller is powered

and the remote switch is not connected to the AGS controller.

3.3.2

Generator Wiring Test

This start/stop test is used to confi rm that all wiring from the generator to

the AGS controller is correct and that the GEN TYPE setting is confi gured

correctly for your generator type.
1. Press and release either:

a) the red TEST switch (on the Controller – see Figure 4-1); or
b) the switch to the TEST position (on the remote switch - see Figure 4-2).

2. After

the

TEST button/switch is pressed and released, the AGS initiates

an automatic generator start/stop sequence.

3. The

STATUS indicator on the controller (and remote switch) begins to

blink green and the generator should start.

4. While the generator is running, view the STATUS indicator and ensure

it turns solid green.

5. The generator should run for approximately 30 seconds before automati-

cally turning off.

Wait for at least 5 minutes to ensure the generator remains off and the AGS

does not attempt another start. If this test passes, then activate the AGS

system by setting the remote switch to ENABLE.
If the STATUS indicator shows a fault condition (solid red LED indication),

press the AGS switch to OFF and then back to the ENABLE or TEST position.

If the problem persists, refer to the Troubleshooting section.

Info: The AGS attempts to start the generator 4 times. If after 4

attempts the generator fails to start, the status LED turns red—in-

dicating a fault.