Installation, Installation overview, Outline of installation steps – Extron electronic PoleVault Systems PVS 400 User Manual

Page 13

Advertising
background image

2-1

PoleVault Systems Installation • Installation Overview

Installation Overview

Installation Overview

This overview outlines the basic steps for installing the PoleVault System. Detailed description of these steps is given

in five sections, Stages One though Five.

N

Additional installation hardware is needed and should be supplied by the installer. See Introduction, “Items not

included”, for a list.

Optional accessories may be desired for this installation. See Introduction, “Optional items”, for a list, or

visit www.extron.com for details.

Refer to local building standards and codes to verify that the installation will meet all the regulatory requirements.

Observe all local and national building and safety codes, UL requirements, and ADA Accessibility Guidelines.

For details of the OSHPD approved method of installation (OPA-1782), consult the

PCM 240 User’s Manual,

68-1180-01, Rev D.

Refer to the specifications on pages 2-31 through 2-33 for system hardware weights and dimensions.

Carefully check inventory of PoleVault system packages, input and output devices, any optional accessories, and

installation hardware before commencing.

Outline of installation steps

Stage One — Install the Screen and Projector.

c

Mark the screen location (page 2-3).

c

Install projector to verify location (page 2-3).

c

Verify the image location (page 2-4).

c

Cut the ceiling tile (page 2-5).

c

Finish projector ceiling mount installation (page 2-5).

c

Secure the projector ceiling mount to the ceiling (page 2-6).

c

Install the screen (page 2-7).

Stage Two

— Install the A/V Source Input Wall Plates and MLC 104 IP Plus.

c

Install the mud rings (page 2-10).

c

Pull cables (page 2-11).

c

Install the wall plates (page 2-12).

c

Install the MediaLink Controller (page 2-13).

Stage Three

— Install the PV SI 3C LP Ceiling Speakers.

c

Cut the ceiling tile (page 2-17).

c

Install the speaker in the ceiling tile (page 2-17).

c

Secure the speakers to the structural ceiling (page 2-18).

c

Cable the speakers (page 2-18).

c

Finish speaker installation (page 2-20).

Stage Four

— Install the PMK 450 and the PVS 204SA.

c

Pull the cables (page 2-22).

c

Install the PMK 450 pole mount kit (page 2-22).

c

Install the PVS 204SA switcher (page 2-23).

c

Finish installing the pole mount kit (page 2-24).

Stage Five

— Configuring the system.

c

Configure the system (page 2-26).

c

Test the system (page 2-28).

c

Final installation (page 2-29).

Where possible in the following pages, line drawings and photos from an actual installation are used to clarify some

of the steps discussed in the text. Each image has a number corresponding to the particular step (e.g.,

Ñ

) described.

Advertising
This manual is related to the following products: