Onnections – Riello UPS Sentinel Dual (High Power) (3.3 - 10 kVA) User Manual

Page 64

Advertising
background image

64

U

SE

C

ONNECTIONS

INSTALLATION MUST BE CARRIED OUT EXCLUSIVELY BY QUALIFIED PERSONNEL.

THE FIRST CONNECTION TO BE CARRIED OUT IS THE PROTECTION CONDUCTOR (EARTH CABLE), TO BE

INSERTED IN THE TERMINAL MARKED

.

THE UPS MUST NOT BE OPERATED WITHOUT BEING CONNECTED TO THE EARTHING SYSTEM.

Warning: if the neutral (N) and phase (F) instructions are observed for the plugs and sockets, the UPS will
not change the existing neutral arrangements when inserted in a system. The resistance on the neutral
connection is less than 0.1 ohm.
A differential switch placed upstream will also be triggered for a fault occurring downstream of the UPS.
The sensitivity of this switch has to take into account the leakage current of the unit (approx. 2 mA) and of
the load which are added together on the UPS earth conductor.

UPS input

Differential switch

Single-phase

Type B or Type A

Three-phase

Type B


The neutral arrangements will only be changed if an isolation transformer is connected or when the UPS is
operating with the neutral isolated upstream.
Avoid connecting the output neutral to the input neutral or to earth as this could damage the UPS .

For the mains and load connections follow the instructions below:

1. Install a 63A magneto-thermal switch with B or C trip curve (4 poles for three phase versions, 2

poles for single phase versions) upstream of the device.

2. The terminals to be used for the connection of the

input and output lines are located inside the IN/OUT
connections drawer. Undo the screw securing the
connections drawer located on the right-hand side of
the drawer (see figure at side).








3. Pull the drawer out as much as is needed for the

terminals to be easily accessible (see figure at side).
WARNING: the drawer has a locking system to
prevent it being pulled out completely. Do not try to
remove the drawer completely.

Advertising