Part 2 installation – Elektra Beckum Cool 401 User Manual

Page 11

Advertising
background image

11

11.02

2.6.3

Connection conden-
sate draining

Fig. 4: Connection conden-

sate draining

The condensate drain pipe (fig. 2.1) may be fixed to the
wall with a rising slope of maximum 5 m. Thereby the
minimum operation pressure increases for 0,1 bar per
meter. The collecting pipe (fig. 2/2) should be laid through-
out its whole length at least as the cross-section of the
condensate outlet.

to treatment

2

1

from condensate drain

Part 2

Installation

Advertising
This manual is related to the following products: