Operation

4.1

Commissioning

4.2

Starting

4.3

Operation

4.4

Stopping

After installation the CA-dryer is supplied with power via
the power cable (fig. 5/1) or by operating the main switch
(fig. 5/13).

Before operating the operation switch (fig. 3/14), a wait-
ing period of at least 6 hours is absolutely necessary.

The CA-dryer is switched on via the operation switch
(fig. 5/14). After approx. 5 minutes the compressed air
admission is possible by connecting the compressed air
compressor.

The CA-dryer is designed for continuous operation and
may remain switched on during periods of no load, as it
adapts to the required performance automatically.

Operation is indicated by the luminous operation switch
(fig. 5/14).
The electronic regulator shows the pressure dew point
reached by the CA-dryer.

At standstill periods, the CA-dryer is switched off with
operation switch (fig. 5/5).
For service works, the CA-dryer is switched off by pull-
ing the power cable (Fig 5/6).
At restarting proceed acc. to item 4.1.