ETA Systems FC01-LQ User Manual

Page 17

Advertising
background image

Flow Meter FC01-LQ

Flow Meter FC01-LQ

Installation

11

Installation

11

2.2.2.1 Mounting instructions for monitoring head CSF-11

Caution!

The two sensors (M) should be screwed into the pipeline far enough to ensure that they
are aligned side by side directly across the direction of flow. The sensors are correctly
positioned when the wrench flats (S) are aligned parallel with the pipeline.

The shoulder of the sensor (7 mm from the tip) must be at the position 1/8 from dia. i.

In the case of vertical pipelines the monitoring head should be installed where the flow is
rising, if possible.

For horizontal pipelines the monitoring head should be mounted on the underside of the
line (suspended).

1/8 from dia.i

dia. i (internal pipe diameter)

1/8 from dia.i

monitoring head should be aligned
in direction of flow (see arrow)

7

threaded installation brush
(stainless steel-cutting ring)

PG16
(nickel-plated brass)

S

M

S

M

M

M

Vertical pipeline

Horizontal pipeline

fig. 7

2.2.2.1 Mounting instructions for monitoring head CSF-11

Caution!

The two sensors (M) should be screwed into the pipeline far enough to ensure that they
are aligned side by side directly across the direction of flow. The sensors are correctly
positioned when the wrench flats (S) are aligned parallel with the pipeline.

The shoulder of the sensor (7 mm from the tip) must be at the position 1/8 from dia. i.

In the case of vertical pipelines the monitoring head should be installed where the flow is
rising, if possible.

For horizontal pipelines the monitoring head should be mounted on the underside of the
line (suspended).

1/8 from dia.i

dia. i (internal pipe diameter)

1/8 from dia.i

monitoring head should be aligned
in direction of flow (see arrow)

7

threaded installation brush
(stainless steel-cutting ring)

PG16
(nickel-plated brass)

S

M

S

M

M

M

Vertical pipeline

Horizontal pipeline

fig. 7

Advertising