ETA Systems FC01-LQ User Manual

Page 18

Advertising
background image

Flow Meter FC01-LQ

Flow Meter FC01-LQ

12

Installation

12

Installation

The monitoring head should be installed only in a straight section of piping. There should be
a distance of at least 20 pipe diameters before the monitoring head, and 5 pipe diameters
after the monitoring head before or after bends and changes in pipe diameter, to avoid any
effects of turbulence.

D = nominal pipe diameter

D

5 x D

20 x D

D

D = nominal pipe diameter

5 x D

20 x D

fig. 8

The monitoring head should be installed only in a straight section of piping. There should be
a distance of at least 20 pipe diameters before the monitoring head, and 5 pipe diameters
after the monitoring head before or after bends and changes in pipe diameter, to avoid any
effects of turbulence.

D = nominal pipe diameter

D

5 x D

20 x D

D

D = nominal pipe diameter

5 x D

20 x D

fig. 8

When installing the monitoring head, please observe that the arrow corresponds to the
flow direction.

Fit monitoring head with locking set as follows (fig. 9):

- Fix first link of chain (1) into the clip (3) (tightening torque 10 Nm).

- Put chain catch (2) into link and fasten with the tight chain.

Caution!

Check locking system with regard to strength!

The locking chain must be mounted as tightly as possible.

When installing the monitoring head, please observe that the arrow corresponds to the
flow direction.

Fit monitoring head with locking set as follows (fig. 9):

- Fix first link of chain (1) into the clip (3) (tightening torque 10 Nm).

- Put chain catch (2) into link and fasten with the tight chain.

Caution!

Check locking system with regard to strength!

The locking chain must be mounted as tightly as possible.

Advertising