Wiring d iagram – EMI S2HB User Manual

Page 7

Advertising
background image

www.enviromaster.com

7

multi-zone Heat Pump Condensing units

t2HB, t3HB, And t4HB InStAllAtIon InStructIonS SEctIon

noTe: For S2HB installation refer to the S2HB Installation Instruction in this manual.

1. Remove the screw on the back panel.

2. R

emove panel to expose eletrical

wiring.

3. L

ocation of electrical and tubing connec-

tions on back of unit.

eleCTriCal Wiring

1. All electrical wiring must be run according

to NEC and local codes.

2. Refer to the unit rating plate for voltage,

minimum circuit ampacity and over cur-

rent protection requirements.

3. Use only HACR type breakers or time

delay fuses. Select the wire size accord-

ing to the ampacity rating.

Remove the

four screws

on the front

panel

4. To access wiring diagram:

a) Remove the four screws on the front

panel of the unit and slide the panel
down until

the upper

edge is free,
then remove

the panel.

b) The wiring

diagram is
located on
the inside

of the front

panel.

w

iring

D

iagram

After the T2HB, T3HB, or T4HB unit is positioned on the concrete slab or platform (refer
to the Site Preparation

in the front of this manual) the T2HB, T3HB, or T4HB is ready

for installation:

Common

Suction
Pressure
Access
Point

High

Pressure

Reset

(18 & 24)

Vapor
(Suction)

Liquid

High Volt

Low Volt

Mounting

Screw

Advertising