I/o backplane upgrade procedure, I/o backplane upgrade checklist – HP INTEGRITY RX3600 User Manual

Page 263

Advertising
background image

If installing an assembly that is neither hot-swappable nor hot-pluggable, disconnect the
power cable from the external server power receptacle.

WARNING!

Ensure that the system is powered off and all power sources are disconnected

from the server prior to removing or installing server hardware (unless you are removing
or installing a hot-swappable or hot-pluggable component).
Voltages are present at various locations within the server whenever an ac power source is
connected. This voltage is present even when the main power switch is turned off.
Failure to observe this warning can result in personal injury or damage to equipment.

Do not wear loose clothing that can snag or catch on the server or on other items.

Do not wear clothing subject to static charge buildup, such as wool or synthetic materials.

If installing an internal assembly, wear an antistatic wrist strap and use a grounding mat,
such as those included in the Electrically Conductive Field Service Grounding Kit (HP
9300-1155).

Handle accessory boards and components by the edges only. Do not touch any metal-edge
connectors or any electrical components on accessory boards.

WARNING!

To reduce the risk of personal injury from hot surfaces, allow the internal system

components to cool before touching them.

I/O Backplane Upgrade Procedure

The following is a checklist for upgrading the server.

Table B-2 I/O Backplane Upgrade Checklist

X

Action

Step

Update the Operating System as necessary

1

1

Update Firmware to the latest revision:
• SFW
• BMC
• iLO 2 MP
• FPGA
• vBios

2

Perform a complete backup

3

Shutdown the Operating System

4

Power down the Server

5

Remove the I/O backplane

6

Move all components to the new I/O backplane:
• Trusted Platform Module
• I/O Voltage Regulator Module
• Core I/O Board
• SAS Core I/O
• LAN Core I/O
• Any other compatible I/O cards

7

Install new core I/O (if necessary)

8

Install the new I/O backplane

9

I/O Backplane Upgrade

263

Advertising