Setting up the blender, Installation, Wwarning – Hamilton Beach Summit Series User Manual

Page 6

Advertising
background image

6

Setting Up the Blender

Installation

Before you begin

Select the installation location carefully. The
following guidelines must be followed when
selecting a suitable location:

The Quiet Shield™ requires at least

508 mm of clearance between the
countertop and any overhead cabinets.
Allow a minimum of 127 mm of clearance
behind the unit.

The unit should be installed within 1.2 m

of a grounded outlet equipped with a
Ground Fault Circuit Interruptor.

The countertop should be level and

stable, and capable of supporting
the blender.

If multiple units are being installed side-

by-side, allow at least 406 mm center to
center between units.

Take proximity to customers, closeness to

ingredients, and sufficient workspace into
consideration when selecting a location.

Installing the Blender

1. Once a suitable location has been

selected, place the blender base on
the counter. DO NOT plug it in at
this time.

2. Install the Quiet Shield according to the

instructions on page 7.

3. Check to make sure there is sufficient

clearance for the Quiet Shield to open
and close properly.

4. Plug the blender into a grounded three-

prong outlet equipped with a Ground
Fault Circuit Interruptor.

w

WARNING

Electrical Shock Hazard

Plug into a grounded outlet.

Do not remove ground.

Do not use an adapter.

Do not use an extension cord.

Failure to follow these instructions
can result in death, fire, or
electrical shock.

A-840083400B-ENv01 11/30/01 3:57 PM Page 6

Advertising