Heat & Glo Fireplace RCOR-HV-IPI User Manual

Page 41

Advertising
background image

Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06

41

Installing the Trim

Combustible materials may be brought up to the specified
clearances on the side and top front edges of the fireplace,
but MUST NEVER overlap onto the front face. The joints
between the finished wall and the fireplace top and sides
can only be sealed with a 300° F. (149° C) minimum sealant.

WARNING: WHEN FINISHING THE FIREPLACE,
NEVER OBSTRUCT OR MODIFY THE AIR INLET/
OUTLET GRILLES IN ANY MANNER.

Install optional marble and brass trim surround kits as
desired. Marble, brass, brick, tile, or other non-combustible
materials can be used to cover up the gap between
combustible material (sheetrock or wood) and the fireplace.

Do not obstruct or modify the air inlet/outlet grilles. When
overlapping on both sides, leave enough space so that the
bottom grille can be lowered and the trim door removed.

Positioning the Logs

If the gas logs have been factory installed they should not
need to be positioned. If the logs have been packaged
separately, refer to the instructions that accompany the
logs. Save the log instructions with this manual.

If sooting occurs, the logs might need to be repositioned
slightly to avoid excessive flame impingement.

!

Step 10. Installing Trim, Logs & Ember Material

Glass Specifications

Model

Type

PIER-HV-IPI

TEMPERED

ST-HV-IPI

TEMPERED

L&RCOR-HV-IPI

TEMPERED

Heat & Glo fireplaces manufactured with tempered glass
may be installed in hazardous locations such as bathtub
enclosures as defined by the CPSC. The tempered glass
has been tested and certified to the requirements of ANSI
Z97.1-1984 and CPSC 16 CFR 1202. (Safety Glazing Certi-
fication Council SGCC # 1595 and 1597. Architectural Test-
ing, Inc. Reports 02-31919.01 and 02-31917.01.)

This statement is in compliance with CPSC 16 CFR Sec-
tion 1201.5 “Certification and labeling requirements” which
refers to 15 USC 2063 stating “…Such certificate shall ac-
company the product or shall otherwise be furnished to any
distributor or retailer to whom the product is delivered.”

Some local building codes require the use of tempered glass
with permanent marking in such locations. Glass meeting
this requirement is available from the factory. Please con-
tact your dealer or distributor to order.

___________________________________________

___________________________________________

___________________________________________

Shutter Settings

NG

LP

PIER-HV-IPI

3/8”

FULL OPEN

ST-HV-IPI

3/8”

FULL OPEN

L&RCOR-HV-IPI

3/8”

FULL OPEN

Figure 42

Preparing Electric Ember Bed and Lava Rock

The electric ember bed must be prepared before the logs
are set up (see Figure 42).

Figure 43.

Start by applying the teco-sil (granulated glass) to the base
pan (see Figure 43).

Pile a thin layer and follow the pattern on the base pan
(see Figure 44).

Figure 44.

Advertising
This manual is related to the following products: